Can I carry out a combined (simultaneous) testing of the INS series Impulse Noise Simulator and VDS Voltage Dip Simulator? How shall the test equipment, associated equipment and EUT be connected?
NoiseKenThe testing you intend can be done. The EUT LINE shall be connected from a service outlet to an isolation transformer, from the secondary of the transformer to LINE INPUT of the VDS, and LINE OUT of the VDS to LINE INPUT of the INS.